APPLICATION SOLUTIONS
PET Bottle Recycling Line Solutions
From incoming bottle bales to a defined flake specification. Set the quality target first, then compare the cleaning route and equipment scope.
Bottles
Clean flakes
Next process

01 / PROJECT FOCUS
Decide what the project must produce
Start with the next user of the material.
Bottle to washed flake
Define the flake quality, moisture and contamination checks with the intended downstream process.
Flake to further processing
If extrusion or another downstream stage is required, quote it as an explicit scope rather than assuming it is part of the wash line.
02 / PROJECT FOCUS
Review the cleaning route
Bottle sorting, size reduction, washing, separation and drying each address a different task. Review the proposed sequence against representative incoming material.
03 / PROJECT FOCUS
Specify quality at the handover
Make the acceptance discussion specific enough to compare supplier proposals.
01
Input boundaries
Bottle source, collection condition and expected foreign material.
02
Flake requirements
Agreed output checks, sampling and target application.
03
Process boundaries
Included separation and cleaning stages, water handling and utilities.
04
Downstream requirements
What the next process needs and who is responsible for verifying it.
04 / PROJECT FOCUS
Keep end-use claims evidence-based
A washed-flake line alone does not establish food-contact suitability. Any such project needs a separately documented process and the applicable validation for its target market.
BEFORE YOU ASK
Frequently asked questions
Can the line produce pellets directly from bottles?
Does hot washing automatically make the output food grade?
What samples are helpful before selecting equipment?
What changes the scope of a PET project?
KEEP EXPLORING
Connect the next decision
Move between equipment, material routes and practical reading as your project brief develops.
YOUR NEXT STEP
Plan your PET recycling route
Tell us the incoming bottle condition, desired final material, target output and destination. State any downstream specification you already have.
Independent equipment sourcing · Clear project scope · Supplier coordination